Switching diff on HCs
(2454)
Switching diff off min HCs
(2455)
Switching diff off max HCs
(2456)
Switching diff on DHW
(2460)
Switching diff off min DHW
(2461)
Switching diff off max DHW
(2462)
To avoid unnecessary switch off during transient effects the switch off difference
adapts dynamically depending on the temperature profile (see
Fig. 21
).
Fig. 21: Switching differential
Tc
t
Switching diff off
Tc (Current temperature)
Switching diff off
max HCs/DHW
(2456/2462)
Switching diff off
min HCs/DHW
(2456/2462)
Switching diff on
HCs/DHW duration
Pressure switch shutdown
(2500)
This function checks the static water pressure with the aid of the connected wa-
ter pressure switch. Depending on the set option (
start prevention
or
lockout posi-
tion
) with shutdown either a start prevention or lockout position occurs with the
corresponding diagnostics.
A closed water pressure switch releases the commissioning on the burner control
and the actuation of the pumps. With open pressure switch is a start prevention
or lockout position triggered.
The pump actuation is also locked for protection against dry running. If the water
pressure increases again and the switch closes again , with a start prevention
these are automatically again cancelled and the pump actuation is again re-
leased.
8.16 Cascade
Lead strategy
(3510)
Considering the specified output range the heat generation is switched on and
off acc. to the set lead strategy. To switch off the effect of the die output range,
the limits must be set to 0% and 100% and the lead strategy to late on, late off.
-
Late on, early off
: additional boiler is switched on as late as possible (output
range max) and back off as early as possible (output range max). I.e. boiler in
operation as little as possible, or short running times for additional boiler.
-
Late on, late off
: additional boiler is switched on as late as possible (output
range max) and back off as late as possible (output range min). I.e. as few as
possible on and off processes as possible for the boiler.
-
Early on, late off
: additional boiler is switched on as early as possible (output
range min) and back off as late as possible (output range min). I.e. boiler in op-
eration as much as possible, or as long as possible running times for additional
boiler.
Release integral source seq
(3530)
A value generated from temperature and time. The following boiler will be
switched on in case of exceeding the set limit. .
Reset integral source seq
(3531)
The following boiler will be switched off in case of exceeding the setpoint
Programming
88
Paramount three 30-115 kW
396532 05.11
Summary of Contents for Gas condensing boiler
Page 1: ...Installation operation and maintenance manual Gas condensing boiler Paramount three 30 115 kW ...
Page 21: ...Fig 5 Connection plan Prior to installation 396532 05 11 Paramount three 30 115 kW 21 ...
Page 24: ...4 8 Legend Prior to installation 24 Paramount three 30 115 kW 396532 05 11 ...
Page 133: ...Space for notes 396532 05 11 Paramount three 30 115 kW 133 ...