Tab. 5: Guide Values for injector pressure (full load)
Model Paramount three
30
40
60
80
95
115
Nominal heat load
heating
kW 5,6-30,0
9,0-38,0
14,0-58,0 21,0-77,0 20,0-95.0 25,0-115,0
Nominal heat output
80/60°C
kW 5,4-29,2
8,7-36,8
13,4-56,3 20,3-74,7 19,4-92,2 24,3-111,7
50/30°C
kW 6,0-31,3
9,6-39,0
14,9-60,1 22,6-79,7 21,4-98,1 26,7-118,6
Injector diameter for
Natural Gas E (G20)
mm
4,90
7,80
7,80
7,80
8,50
10,30
LPG (propane)
mm
3,90
5,80
6,20
6,20
6,50
7,40
Guide values for injector pressure
*
G20 (15,0)
mbar
8,3-9,3
6,0-7,0
6,5-7,5
10,5-11,5 13,0-14,0 13,0-14,0
Propane
mbar
8,3-9,3
6,0-7,0
7,0-8,0
10,5-11,5 15,0-16,0 15,5-16,5
the CO
2
-content should be
- between 8.3% and 8.8% for natural gas
- for liquid gas be between 10,3% and 10,7%
* at pressure at end of boiler 0 mbar, 1013 hPa, 15 °C
5.17 Electrical connection
(general)
Risk of electric shock!
All electrical work in connection with the installation must
only be carried out by a qualified electrician!
- Mains supply AC 230 V +6% -10%, 50 Hz
The boiler must be installed on an uninterrupted supply with the correct polarity.
For the power supply, use the power cable attached to the boiler or cable types F 3
x 1 mm
2
or 3 x 1.5 mm
2
.
We recommend the installation of a mains isolator upstream of the Paramount.
This should isolate all poles and provide contact separation of at least 3 mm.
Cable lengths
Bus/sensor lines
do not have mains voltage, but small protective voltage. They
must not be installed
in parallel with mains lines
( induced signals). Shielded ca-
bles have to be installed if this is unavoidable.
Permissible cable lengths for all bus sensors:
- Cu-cable up to 20m: 0,8 mm
2
- Cu-cable up to 80m: 1 mm
2
- Cu-cable up to 120m: 1,5 mm
2
Strain relief fittings
All cables must be routed through the cable entries supplied and inserted through
the holes in the boiler base and then secured. Also secure cables by means of the
strain relief fittings on the control panel and then connect in accordance with the
wiring diagram (
Fig. 9
).
Installation
396532 05.11
Paramount three 30-115 kW
31
Summary of Contents for Gas condensing boiler
Page 1: ...Installation operation and maintenance manual Gas condensing boiler Paramount three 30 115 kW ...
Page 21: ...Fig 5 Connection plan Prior to installation 396532 05 11 Paramount three 30 115 kW 21 ...
Page 24: ...4 8 Legend Prior to installation 24 Paramount three 30 115 kW 396532 05 11 ...
Page 133: ...Space for notes 396532 05 11 Paramount three 30 115 kW 133 ...
Page 134: ...Space for notes 134 Paramount three 30 115 kW 396532 05 11 ...
Page 135: ...Space for notes 396532 05 11 Paramount three 30 115 kW 135 ...