- the air inlet must not be restricted;
- flammable materials and liquids must not be stored in the vicinity of the gas
boiler;
- the customer has to carry out the following control checks himself:
- pressure check on the manometer;
- check the discharge from the safety valve;
- only approved gas installers may carry out the inspection and maintenance.
Documents
- The documents, belonging to the boiler, have to be handed over with the in-
structions and they have to be kept in the installation room of the boiler.
- A copy of the commissioning sheet with confirmation and legally binding signa-
ture to the customer. All components have been installed according to the in-
struction of the manufacturer. The whole plant complies with the relevant Brit-
ish Standards and current Building Regulations.
Commissioning