
Fig. 34: Remove burner
Eurocondense three
215 - 300 E
Eurocondense three
125 - 170
7. Remove nuts and washers and pull out the entire burner (5) with burner seal
(6) forwards
Installing burner
The installation of the burner is done in the opposite sequence
Note: Use new seals when installing the burner.
Maintenance
132
Condensing gas boiler Eurocondense three125-300 kW
7308536-02 06.13