1.
Switch on heating isolator switch
2. Open gas shut-off installation
3. Open front panel cover and switch on the operating switch on the front panel
of the boiler
4.
xxxxxxxxxxxxxx
Select the operation mode
automatic operation
with the operation mode but-
ton on the control unit
Auto
5.
Set the required room temperature on the rotating knob of the control unit
6.4 Temperatures for heating
and drinking water
The information in the section
Programming
for setting the temperatures for heat-
ing and drinking water.
For DHW heating a setting between 50 and 60°C is recommended.
Note:
The times for DHW will be set in time programme 4/ TWW.
For reasons of
comfort, the start of DHW heating should be approximately 1 hour before start of
heating!
6.5 Individual time programme
The gas condensing boiler can be commissioned having its standard values.
For setting e.g. an individual time programme, please observe section
Program-
ming
(tab. 5)
.
6.6 Instruction for the customer
Instruction
The customer should be instructed in the operation of the boiler and the function
of the safety devices. The following should be pointed out: