
PStick command
(7252)
-
No operation
: this is the base condition. As long as no operation is active on the
stick, this command is displayed.
-
Reading from stick
: starts reading the data from the stick. This operation is only
possible with READ sticks. The data of the set data set is copied in the LMS con-
trol. Beforehand is checked whether the data set may be brought in. If the data
set is incompatible, it may not be brought in. The display resets to no operation,
displays an error message. The text Read from stick remains until the operation
is completed or an error occurs. As soon as the data transmission begins, the
LMS control goes in a parameterization position. As soon as the parameter is
transferred, the LMS control must be unlocked after ending the transmission.
Error 183 parameterization is displayed.
-
Writing on stick
: Starts writing the data from the LMS control to the stick. This
operation is only possible with WRITE sticks. The data is written in the previous-
ly set data set. Before writing of the data begins, it is checked whether the data
fits on the stick and the respective customer number is correct. The text Writing
to stick remains until the operation is completed or an error occurs.
PStick progress
(7253)
The read or write progress is displayed as a percentage. If no operation is active or
an error shows up, 0% is displayed.
8.4.21 Input/output test
Input/output tests
(7700 - 7872)
Tests for checking the connected components for function.
8.4.22 State
State
(8000 bis 8011)
With this function the state of the selected system can be requested.
Programming
120
Condensing gas boiler Eurocondense three125-300 kW
7308536-02 06.13