Customer Services (858) 578-7887 & (888) GO IN
TEC
IN
TEC
Controls, 12700 Stowe Dr., Suite 110, Poway, CA 92064
Fax (858) 578-4633 & (888) FX IN
TEC
www.inteccontrols.com
Specification subject to change without notice.
Printed in USA 140225
Polygard® is a registered trademark of MSR
SPC3-11XX US
PolyGard
®
Single-Point Controller
User Manual - SPC3-11XX
Page 24
4.3
Connector Block / Overview SPC3 Module
Fig.
4
Fig.
5
5 Commissioning
5.1 Commissioning
Prior to commissioning, the wiring of the SPC3 including all field devices must be completely terminated!
Check the optional external transmitter input signal, it has to be the same as indicated on the label of the PCB. See
Fig. 5
Select the contact for relay 2 with jumper NC/NO. See fig. 2/3 and 5.
Select the analog output signal with jumper V-A and 0-20%. See Fig. 5
After switching the power supply “ON” and at the end of the Power ON Time, the SPC3 is ready for use.
The SPC3 is delivered with standard setups and set points. The registration of the optional external gas transmitter
and the assignment of the alarm relays to the individual alarms must always be performed during commissioning.
Additionally all other setups have to be checked and adapted to the local conditions.
The standard setups can be taken from the following configuration and setup card. We recommend registering the
individual setups and set points into the list.
We recommend checking the setups and set points according to the following check list.
10
98
76
432
1
123
456
7
X5
X4
7
6
5
4
3
2
6
1
9
4
7
2
8
3
1
10
5
R2
X4
V-A
XA3-1
XA3-2
Ga
in
ATX3_003
0-20%
Te
st
Sensor
R1
X5
Zero
Option
Relay
Anal. Output
= V DC
= mA
Anal. Ouput
Start Point
= 20 %
= 0 %
Calibration
11
44
6
X8
1
D5
D6
LCD
IN
SPC3
TEC
F
unct
io
n R
2
=
N
C
=
N
O