![Polaris RZR PRO R Service Manual Download Page 306](http://html1.mh-extra.com/html/polaris/rzr-pro-r/rzr-pro-r_service-manual_1572296306.webp)
8.6
9940259 R02 - 2022
RZR
PRO R / PRO R 4 Service Manual
© Copyright Polaris Industries Inc.
7. Remove four fasteners
t
and remove hub assembly
from the bearing carrier.
8. Rotate bearing by hand and check for smooth
rotation. Visually inspect bearing for moisture, dirt, or
corrosion.
IMPORTANT
Due to extremely close tolerances and minimal wear,
the bearings must be inspected visually, and by feel.
While rotating bearings by hand, inspect for rough
spots, discoloration, or corrosion. The bearings should
turn smoothly and quietly, with no detectable up and
down movement and minimal movement sideways
between inner and outer race.
9. Replace hub assembly if moisture, dirt, corrosion, or
roughness is evident.
REAR BEARING CARRIER
INSTALLATION
1. Install hub assembly into rear bearing carrier. Torque
fasteners to specification.
TORQUE
Rear Hub Mounting Fasteners:
81 ft-lbs (110 Nm)
2. Install drive shaft through the backside of the bearing
carrier.
3. Install upper and lower radius rods. Torque fasteners
to specification.
TORQUE
Rear Radius Rod Fasteners:
Inner Radius Rod Fasteners (Single Use): 52 ft-lbs
(70 Nm) + 90°Outer Radius Rod Fasteners: 133 ft-
lbs (180 Nm) - Torque bolt side