
9940259 R02 - 2022
RZR
PRO R / PRO R 4 Service Manual
© Copyright Polaris Industries Inc.
3.91
4. Install camshaft carriers and fasteners. Tighten the
camshaft fasteners in increments of three turns until
they are seated. Torque to specification in the
sequence shown.
TORQUE
Camshaft Carrier Fasteners:
13 ft-lbs (17 N·m)
5. Assemble the timing chain with indicator marks as
shown.
MEASUREMENT
12.7° or approximately the 4 o’clock position
IMPORTANT
There are 4 colored links on the timing chain. Use the
following procedure to line up the links with the
actuators. Orient the chain so that the colors are visible.
Always use new actuator bolts.
6. Hand tighten the new intake camshaft actuator bolt.
7. Line up the indicator marks on the chain to the 12
o’clock position of the intake and exhaust sprockets
as shown.
8. Line up the indicator dot on the crankshaft in the 4
o’clock position as shown. Route the timing chain
around the crankshaft sprocket and align crankshaft
indicator dot between the colored links in
approximately the 4 o’clock position.