
User’s Manual of GS-5220 LCD Series
141
Figure 4-2-30:
System Reboot Page Screenshot
Buttons
: Click to reboot the system.
: Click to return to the Port State page without rebooting the system.
You can also check the
SYS LED
on the front panel to identify whether the System is loaded
completely or not. If the SYS LED is blinking, then it is in the firmware load stage; if the SYS
LED light is on, you can use the Web browser to login the Managed Switch.
Summary of Contents for GS-5220 Series
Page 1: ...User s Manual of GS 5220 LCD Series 1 GS 5220 Series L2 Gigabit 10 Gigabit Managed LCD Switch ...
Page 18: ...User s Manual of GS 5220 LCD Series 18 ...
Page 253: ...User s Manual of GS 5220 LCD Series 253 Figure 4 8 1 Multicast Service ...
Page 254: ...User s Manual of GS 5220 LCD Series 254 Figure 4 8 2 Multicast Flooding ...
Page 413: ...User s Manual of GS 5220 LCD Series 413 Figure 4 11 11 RADIUS Server Configuration Screenshot ...
Page 510: ...User s Manual of GS 5220 LCD Series 510 Figure 4 16 8 LLDP Configuration Screenshot ...