© 2020 - perma-tec
GmbH & Co. KG
|
www.perma-tec.com
|
55
54
|
perma ECOSY
12.2 Dismounting the ECOSY 5
Position the ECOSY 5 upright at a safe place so that no oil may
spill and the system is protected against damages and overturn-
ing (recommendation: place the lubrication system in a leak proof
container like a tub)!
• Dismount ECOSY 5 from application (see chapter 5 for mounting
steps and use reversed order for dismounting).
• Remove any loose parts and clean workplace.
13 Shipping
Preparation and Dispatch
• Use original packing.
• Dismount the system according to chapter 12 and empty it
completely.
• Tightly seal openings with plugs or blind plugs.
Make sure that the packing material is not damaged and that no
oil can leak!
• Wrap ECOSY 5 with oil-tight foil and seal it with tape.
• Place ECOSY 5 in its original packing and secure it against
bumps and mechanical influences using packing material.
• If ECOSY 5 is sent to your local supplier, enclose shipping docu-
ments and technical notes (or a description of the problem).
• Hand over the parcel to a delivery agent for forwarding to
local supplier.
CAUTION
CAUTION