© 2020 - perma-tec
GmbH & Co. KG
|
www.perma-tec.com
|
55
54
|
perma ECOSY
12
Dismounting the Lubrication System
12.1 Preparation for Dismounting
Follow these instructions BEFORE you dismount ECOSY 5:
• Disconnect ECOSY 5 from power supply!
• Observe safety instructions - chapter 2!
• Observe safety instructions for handling lubricants
- chapter 2.4 page 11!
• Tubes might be under pressure. To catch leaking oil, place oil
sump under ECOSY 5. Get assistance if necessary.
• Remove tubes from tube connections (6, Fig. 3-2). First, push the
release of the tube connection (using a suitable tool) and then
pull out the tube.
• When removing tube connections from lubrication points, use an
oil sump to catch any leaking oil (proceed the same way for any
connections, extensions, T-connections, couplings and fittings).
• Empty the tubes and pour oil into appropriate containers.
• Tightly seal containers and secure them against unintentional
spilling.
• Seal tube ends with plugs or blind plugs.
• Tightly seal tube connections on the ECOSY 5 with plugs or blind
plugs.
• Absorb any spilled oil and completely remove it from the floor.
If ECOSY Control sensor is installed:
• Disconnect the plug-in connector of the control sensor or PLC
from the ECOSY 5.
WARNING