Special connections:
1 phase connection (1 1N a.c. 230 V / 50 Hz):
The voltage between live and neutral is 230 V a.c.
Install connecting bridges between connection points 1-2 and 4-5. Your group
must be protected by a fuse of at least 32 A. The connecting power cable must
have a minimum core cross section of 6 mm
2
.
2 lives with 1 neutral connection (2 1N a.c. 400 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c. Between the lives
there is a voltage of 400 V.
If there is not a voltage of 400 V between the
lives, two wires have been taken from the same live in the meter cupboard
and the hob must be connected with two neutral wires, as indicated above
under 2 lives with 2 neutrals.
Install a connecting bridge between the
connection points 4-5. Your groups must be fused with at least 16 A (2x). The
connecting power cable must have a minimum core cross section of 2,5 mm
2
.