
Preparing for Measurement
NanoPlus Operator’s Manual
A-10
Mar 2014
Configuring Titration Solutions
You can set acid/base/other solutions such as additive for the titration.
1.
Select Configuration in the pH Maintenance window.
2.
Select the vial position number to which acid, base, or other solution is to be set and select the
type of solution. Then enter the molar concentration for each solution. If a vial is not going to
be used, deselect the vial position number.
3.
Select the type of vial to be used: 50 mL or Beaker.
4.
Click
OK
to save and close the dialog.
Calibrating the pH Electrode
Calibrate the pH electrode before starting measurement (refer to
). Calibration is not required for each measurement, but it should be done once a day, for
example, before the first titration.
Summary of Contents for NanoPlus
Page 1: ...NanoPlus Zeta Potential Nano Particle Analyzer Operator s Manual V5 22 P09 42801 01 March 2014...
Page 80: ......
Page 114: ......
Page 176: ...Consumables NanoPlus Operator s Manual A 30 Mar 2014 Tubing...
Page 188: ......
Page 192: ......
Page 213: ...NanoPlus Operator s Manual Temperature Gradient Plot Mar 2014 D 21 With Temperature Marker...
Page 232: ......
Page 246: ......
Page 252: ......