
Maintenance
NanoPlus Operator’s Manual
5-26
Mar 2014
Low Conductivity Cell
This section describes how to maintain the Low Conductivity Cell for Zeta Potential measurement.
Cell holder
Glass cell
Cell cap
Electrode blocks
O-rings (P4 perfluro)
Assembled
In order to use an organic solvent, and since the structure of a cell is not a sealing system, use the
Low conductivity cell at near ambient temperatures.
Assembling the Low Conductivity Cell
1.
Attach an O-ring to each electrode block.
Electrode block
O-ring
2.
Holding the cell on the sides, insert it into the cell holder. Orient and align the surface of the
glass cell so that the opening is flat against the surface of the cell block.
Cell guide
Glass cell
Summary of Contents for NanoPlus
Page 1: ...NanoPlus Zeta Potential Nano Particle Analyzer Operator s Manual V5 22 P09 42801 01 March 2014...
Page 80: ......
Page 114: ......
Page 176: ...Consumables NanoPlus Operator s Manual A 30 Mar 2014 Tubing...
Page 188: ......
Page 192: ......
Page 213: ...NanoPlus Operator s Manual Temperature Gradient Plot Mar 2014 D 21 With Temperature Marker...
Page 232: ......
Page 246: ......
Page 252: ......