
Maintenance
NanoPlus Operator’s Manual
5-8
Mar 2014
Flow Cell
This section describes how to disassemble and assemble the Flow Cell, as well as how to wash the
glass cell.
1
Cell Holder
6
Cell Guide (2)
2
Clamping Knob (2)
7
Luer Fitting (2)
3
O-ring (8); (6 spares)
8
Glass Cell
4
Electrode (2)
9
Cell Stopper
5
Sealing Rubber (2); (6 spares)
10
Plug (2)
1
2
3
4
5
6
7
8
9
10
Assembled
Disassembled
Disassembling the Flow Cell
Wear protective gloves when disassembling the cell. There may be residual acidic/
alkaline sample solution remaining in the cell.
1.
Drain the sample solution in the cell.
2.
Remove the cell stopper by turning it clockwise.
3.
Remove the Luer fitting by turning it counterclockwise.
Summary of Contents for NanoPlus
Page 1: ...NanoPlus Zeta Potential Nano Particle Analyzer Operator s Manual V5 22 P09 42801 01 March 2014...
Page 80: ......
Page 114: ......
Page 176: ...Consumables NanoPlus Operator s Manual A 30 Mar 2014 Tubing...
Page 188: ......
Page 192: ......
Page 213: ...NanoPlus Operator s Manual Temperature Gradient Plot Mar 2014 D 21 With Temperature Marker...
Page 232: ......
Page 246: ......
Page 252: ......