
ORLI
Č
AN M-8 EAGLE
PILOT'S OPERATING
REVISION NO. 05
DATE OF ISSUE: MAY 02,
8. NORMAL PROCEDURES
8.1. INTRODUCTION
Section 8 provides checklist for the pre-flight inspection and recommended procedures for normal
operation of the airplane. Normal procedures following from system installation and optional equipment,
which require supplementation of this Manual, are shown in section 15 - Supplements.
8.2. PRE-FLIGHT INSPECTION
The pre-flight inspection is very important and must be accomplished by pilot before each flight. An
incomplete or careless inspection could allow airplane failure.
The following pre-flight inspection procedure is recommended by the airplane manufacturer:
NORMAL PROCEDURES
PAGE 48 OF 99
Summary of Contents for M-8 EAGLE 2022
Page 18: ...ORLIČAN M 8 EAGLE PILOT S OPERATING REVISION NO 05 DATE OF ISSUE MAY 02 ...
Page 21: ...ORLIČAN M 8 EAGLE PILOT S OPERATING REVISION NO 05 DATE OF ISSUE MAY 02 6 THREE VIEW DRAWING ...
Page 45: ...ORLIČAN M 8 EAGLE PILOT S OPERATING REVISION NO 05 DATE OF ISSUE MAY 02 ...
Page 54: ...ORLIČAN M 8 EAGLE PILOT S OPERATING REVISION NO 05 DATE OF ISSUE MAY 02 ...