3 - 3
3 Basic Application Procedures
E3NW-CCL CC-Link Digital Sensor Communications Unit User’s Manual (E431)
3-
1 Sett
ing
Examp
les an
d Basic
P
ro
cedu
res
3
3-
1-2 Basic Pr
ocedu
res
The following figure shows the flow of procedures for this section.
3-1-2
Basic Procedures
Mount and set up the slaves.
Wire the communications cables.
Connect the Sensors.
Start the system.
Start CC-Link communications.
START
Setting and Wiring Hardware
Confirming Operation
3.2.2
3.2.3
3.2.4
3.2.5
3.3.1
3.3.3
3.3.2
Mount and set up Distributed Sensor Units
(if the DS-Bus network is used between Units).
3.2.2
Starting Communications
Mount and set up the CC-Link master.
Check the Unit displays.
Connect the power supplies.
Set up CC-Link communications.
3.2.1
3.4.1
Check reading and writing of data.
3.4.2
END
Set slave parameters.
3.4.3
Summary of Contents for E3NW-CCL
Page 1: ...E3NW CCL CC Link Digital Sensor Communications Unit User s Manual Cat No E431 E1 08 ...
Page 114: ...A Appendices A 34 E3NW CCL CC Link Digital Sensor Communications Unit User s Manual E431 ...
Page 116: ...B B 2 E3NW CCL CC Link Digital Sensor Communications Unit User s Manual E431 ...
Page 117: ......