![background image](http://html1.mh-extra.com/html/omron/cj-12-2004/cj-12-2004_manual_740789054.webp)
35
Connections and Wiring
Section 3-4
• When Racks are installed in parallel with each other, keep them sepa-
rated by at least 300 mm.
• When placing cables in the same duct, separate them with grounded iron
plates.
300 mm min.
300 mm min.
Power lines
Low-power cables
Control cables
High-power cables
R/W Head cables and
PLC I/O lines
Ground to 100
Ω
or less.
SYSMAC power supply
lines and general
control circuit lines
200 mm min.
Power lines
PLC I/O lines
Ground to 100
Ω
or less.
Iron plate
SYSMAC power supply
lines and general
control circuit lines
Summary of Contents for CJ - 12-2004
Page 2: ...SYSMAC CS CJ Series ID Sensor Units Operation Manual Revised December 2004...
Page 3: ...iv...
Page 11: ...xii...
Page 55: ...36 Connections and Wiring Section 3 4...
Page 69: ...50 I O Data Allocations Section 4 3...
Page 91: ...72 Data Check Section 5 7...
Page 141: ...122 Sample Programming Appendix B...
Page 147: ...128 Revision History...