2-18
Periodic maintenance
411-2051-500
Draft
00.01
November 1999
18
Verify that the cables and clamps connecting the guy wires to the grounding system are
secure
19
Verify that transmission cables are grounded at both the top and bottom of the tower,
and the building entrance
20
Buildings with metal walls, roof or base, all metal parts are grounded
21
Site fence, fuel tank or other metal structures are grounded
22
Check that grounding cables and clamps are secure
Antennas and tower
23
Check the tower base for cracks, concrete break up and upheaval
24
Check all guy anchors for cracks or upheaval
25
Check guy tension and attachment
26
Check fasteners for security
27
Check all components for rust
28
Check for flaking paint (often a sign of over-stress)
29
Check the over-all condition of the paint; re-paint if necessary
30
Check that the transmission line is adequately supported and protected between the cell
site building and the antenna tower
31
When tower is climbed, check grounding on the higher parts
32
When tower is climbed, check the tower lights
33
When tower is climbed, perform structural inspection of antenna:
• Check for correct orientation and tilt
• Check for cracks, dents, burns
• Check for fasteners, attachment and security
• Check for transmission line and ground attachment security
• Check for audible gas leakage in pressurized system
Site performance
34
Confirm coverage by making calls from the fringe of the site coverage area
35
Confirm handoffs by driving across the cell boundaries with a call established
36
Perform an antenna sweep test
- continued -
Summary of Contents for DualMode 800
Page 2: ......
Page 4: ......
Page 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Page 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Page 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Page 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Page 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Page 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Page 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Page 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Page 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Page 215: ......