2-14
Periodic maintenance
411-2051-500
Draft
00.01
November 1999
DualMode 800 Enclosure MONTHLY Checklist
Date:
____________________________
Performed by:
___________________________
1
Perform the EVERY VISIT routine checks
Power - Battery
2
Check the battery voltages and note any discrepancies.
3
Check terminals, connectors for signs of moisture or corrosion
Power - BCM
4
Check that the BCM output voltage is within specification
Housekeeping
5
Mop the floors at least once a month to keep dust levels to a minimum
Summary of Contents for DualMode 800
Page 2: ......
Page 4: ......
Page 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Page 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Page 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Page 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Page 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Page 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Page 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Page 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Page 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Page 215: ......