xii
Contents
Nortel Networks Confidential
411-2051-500
Draft
00.01
November 1999
Figure 11-3 MCPA front panel layout
11-3
Figure 11-4 DRU transmit tests setup (service affecting)
11-14
Figure 11-5 DRU receive tests setup (shelf/site service affecting)
11-24
Figure 11-6 RSSI offset setup
11-29
Figure 11-7 Transmit RF output power test setup
11-39
Figure 11-8 Transmit power level of a DualMode 800 Enclosure with 24-channel per
cell/sector using two MCPA modules
11-41
Figure 11-9 Digital loopback paths
11-43
Figure 11-10 BER test setup at the cell site
11-47
Tables
Table 1-1
Transitions in the TRU3 LED state
1-24
Table 1-2
TRU Fullscreen command summary
1-31
Table 1-3
TRU Fullscreen commands
1-32
Table 1-4
Command line mode maintenance commands
1-36
Table 1-5
Command line mode measurement commands
1-40
Table 1-6
Command line mode test commands
1-42
Table 2-1
Maintenance schedule example
2-9
Table 3-1
DRU to Interface Terminal connection
3-2
Table 4-1
Minimum bending radii of power cables
4-2
Table 4-2
RIP1 circuit breaker assignments and ratings
4-3
Table 4-3
RIP2 circuit breaker assignments and ratings
4-3
Table 4-4
RIP3 circuit breaker assignments and ratings
4-3
Table 9-1
Naming convention of the MTX trunk tests
5-9
Table 11-1
DRU configurations for analog tests
11-8
Table 11-2
RSSI characteristics
11-28
Table 11-3
DRU configuration for RSSI characteristics
11-34
Table 11-4
RSSI measurement characteristics
11-34
Table 11-5
Nominal DualMode 800 Enclosure per-carrier power level at the output
port of the MCPA shelf
11-40
Table 12-1
DualMode Urban field replaceable units
12-1
Procedures
Procedure 9-1
Posting the DCSM
9-4
Procedure 9-2
Control Channel test set-up
9-5
Procedure 9-3
Measuring forward CCH RF power
9-6
Procedure 9-4
Measuring reverse CCH RF power
9-6
Procedure 9-5
Round Robin Monitoring
9-7
Procedure 9-6
Querying ACCH OMT parameters
9-8
Procedure 9-7
Querying the DCSM parameters
9-8
Procedure 9-8
Initiating the MALT/MAHT test
9-11
Procedure 9-9
Initiating the MRLT/MRHT tests
9-13
Procedure 9-10 Initiating the MRLP test
9-16
Procedure 9-11 Initiating the MRLR test
9-18
Procedure 9-12Invoking the DTRM or MTRM tests
9-20
Summary of Contents for DualMode 800
Page 2: ......
Page 4: ......
Page 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Page 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Page 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Page 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Page 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Page 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Page 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Page 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Page 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Page 215: ......