1-42
Equipment operation
Nortel Networks Confidential
411-2051-500
Draft
00.01
November 1999
Command line mode test commands
Testing ensures the proper working order of the DRU’s components. Each test
result is sent to the ICP by request or regular audit. Testing can be initiated by
entering the appropriate command from the ASCII terminal, by a message
sent from the ICP, or by regular audits on the DRU. An audit test failure
initiates an alarm unless the alarms are disabled. Table 1-6 gives the name,
command, state, and action for the Command line mode test commands.
Table 1-6
Command line mode test commands
Name
Terminal
Command
Personality
Allowed
Action/Initial value
Calibration Table
Sanity Tests (For
TRU2 only)
TEST EEPROM
Any
Calibration information is stored in EEPROM
along with an associated CRC. This test
calculates each table’s CRC and compares to
the stored CRC. If a table has not been written,
the result is ”n/a”.
DSP Sanity Test
TEST DSP ALL
Maint.
This test checks the basic sanity of the DSPs
by checking for basic messaging ability in each
one.
Flash Load CRC
Test
TEST FLASH
Any
This test reads all data stored in flash
EEPROM, calculates the CRC, and compares
this value against the CRC stored in the flash
EEPROM.
Individual DSP
Sanity Test
TEST DSP dspid# Maint.
This test is similar to the previous one except
that the sanity test is only run on a particular
DSP chip.
RAM Read/Write
Test (For TRU2
only)
TEST RAM
Any
The read/write memory is checked to ensure
that all locations can be written to and read, and
that each address accesses a unique memory
location.
- End -
Summary of Contents for DualMode 800
Page 2: ......
Page 4: ......
Page 6: ...vi Publication history Nortel Networks Confidential 411 2051 500 Draft 00 01 November 1999...
Page 82: ...2 20 Periodic maintenance 411 2051 500 Draft 00 01 November 1999...
Page 90: ...3 8 Test equipment and precautions 411 2051 500 Draft 00 01 November 1999...
Page 100: ...5 6 Master Oscillator tests 411 2051 500 Draft 00 01 November 1999...
Page 106: ...6 6 Antenna and transmission line tests 411 2051 500 Draft 00 01 November 1999...
Page 116: ...8 4 Alarm Control Unit ACU tests 411 2051 500 Draft 00 01 November 1999...
Page 138: ...10 2 ICRM tests 411 2051 500 Draft 00 01 November 1999...
Page 200: ...12 10 Enclosure maintenance 411 2051 500 Draft 00 01 November 1999...
Page 208: ...A 8 Appendix A Frequency table 411 2051 500 Draft 00 01 November 1999...
Page 215: ......