Operation
4-9
P/N 7105144G
2008 Nordson Corporation
VersaBlue_NW
CAUTION:
Heating and cooling that occurs during daily operation can
cause screwed parts to loosen, resulting in leakage.
10. On the first day, while the material is still soft (approx. 70
°
C/158
°
F,
depending on the material), tighten the following:
Safety valve
Pressure sensors (when applicable)
Plugs
Hose connections
Then check at regular intervals and repeat as required. Refer to section
Maintenance
.
Summary of Contents for VersaBlue VB Series
Page 40: ...Introduction 2 14 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 66: ...Installation 3 26 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 150: ...Operation 4 84 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 174: ...Maintenance 5 24 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 236: ...Parts 8 2 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 250: ...Options 10 6 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 254: ...Password A 4 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 280: ...Glossary D 16 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...