Operation
4-37
P/N 7105144G
2008 Nordson Corporation
VersaBlue_NW
Switching On/Off Heaters
The heaters can be switched on via the control panel, the
Standard I/O
interface, the seven-day-clock or the field bus. The main switch must be set
to I/ON.
The main contactor closes. The power supply to heaters and motors is
switched on. The heatup phase begins.
NOTE:
When the heaters have been switched off, the control unit continues
to be supplied with voltage, so the heaters can be switched on at any time
via the seven-day clock.
Switching On/Off Seven-day Clock
Refer to
Control Panel
−
Overview
−
/ V8
Activate Password Protection
The password protection (selected security level) is active immediately; if
this key is not touched, it is activated after 10 minutes.
Refer to
Control Panel
−
Overview
−
/ V19
.
NOTE:
This key is visible only when a password has been entered.
Summary of Contents for VersaBlue VB Series
Page 40: ...Introduction 2 14 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 66: ...Installation 3 26 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 150: ...Operation 4 84 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 174: ...Maintenance 5 24 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 236: ...Parts 8 2 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 250: ...Options 10 6 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 254: ...Password A 4 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 280: ...Glossary D 16 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...