Maintenance
5-5
P/N 7105144G
2008 Nordson Corporation
VersaBlue_NW
Visual Inspection for External Damage
WARNING:
When damaged parts pose a risk to the operational safety of
the melter and/or safety of personnel, switch off the melter and have the
damaged parts replaced by qualified personnel. Use only original Nordson
spare parts.
Safety and Function Tests
During power up of the melter, the lights in the light tower are all switched
on briefly as a test. The operator should check whether all lights function
properly. Replace defective lamps.
Detaching Protective Panels
Open the protective panels with a 4 mm Allan key.
On the inside
Detaching Insulation Blanket
1. Release Velcro and clamps.
2. Take insulation blanket out of hooks.
2
1
2
1
Summary of Contents for VersaBlue VB Series
Page 40: ...Introduction 2 14 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 66: ...Installation 3 26 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 150: ...Operation 4 84 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 174: ...Maintenance 5 24 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 236: ...Parts 8 2 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 250: ...Options 10 6 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 254: ...Password A 4 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...
Page 280: ...Glossary D 16 P N 7105144G 2008 Nordson Corporation VersaBlue_NW...