1
.
Inspection
9
No.704-2010-01
2.2.
Replacement procedure of H1 heater
(1) Preparation of tools/parts
(2) Parts dismounting
Turn the main power OFF. Do not start working when the temperature of each heater
is high. (Start working after 2 hours from turning the power OFF when the temperature
is high.)
Pull up the ring latch and remove the top cover panel. (Remove the two screws first in
case of the Version II type.)
Pull out the sample heating tube and the mercury collection tube from the front.
No.
Name
Part No.
Qty
Remarks
①
Philips screwdriver
(
02
)
1
Tool
②
Long-nose plier
1
Tool
③
Ball-point screwdriver
1
Accessory
④
Adjustable wrench (small)
1
Tool