1
.
Inspection
15
No.704-2010-01
⑪
Connect the elbow joint to the branch pipe
on the sample inlet.
⑫
Install the pipe heater cover and sample
heater tube retainer. Close the front cover
and install the top cover.
⑬
Turn ON the power of the MA-3000 and
perform the check of flow path to make sure
that there is no leak.