![NetApp SG100 Hardware Installation And Maintenance Manual Download Page 9](http://html.mh-extra.com/html/netapp/sg100/sg100_hardware-installation-and-maintenance-manual_1669914009.webp)
Task
Instructions
Adding an appliance Gateway or Admin Node to an
existing StorageGRID system
Instructions for expanding a StorageGRID system
Deploying an appliance Gateway or Admin Node as part
of a node recovery operation
Instructions for recovery and maintenance
Related tasks
Preparing to install a StorageGRID appliance entails preparing the site and obtaining all required
hardware, cables, and tools. You should also gather IP addresses and network information.
on page 21
Hardware installation entails installing the appliance into a cabinet or rack, connecting the cables,
and applying power.
Configuring StorageGRID connections
Before you can deploy the services appliance as a node in a StorageGRID system, you must
configure the connections between the appliance and the networks you plan to use. You can
configure networking by browsing to the StorageGRID Appliance Installer, which is pre-installed
on the services appliance.
Related information
Expanding a StorageGRID system
Recovery and maintenance
Administering StorageGRID
Hardware Installation and Maintenance Guide for SG100 and SG1000 Appliances
9
Installation and deployment overview