Preparing for installation
Preparing to install a StorageGRID appliance entails preparing the site and obtaining all required
hardware, cables, and tools. You should also gather IP addresses and network information.
Steps
1.
2.
on page 11
3.
Obtaining additional equipment and tools
on page 11
4.
5.
Reviewing appliance network connections
6.
Gathering installation information
Preparing the site
Before installing the appliance, you must make sure that the site and the cabinet or rack you plan
to use meet the specifications for a StorageGRID appliance.
Steps
1. Confirm that the site meets the requirements for temperature, humidity, altitude range, airflow,
heat dissipation, wiring, power, and grounding. See the NetApp Hardware Universe for more
information.
2. Confirm that your location provides the correct voltage of AC power (in the range of 120 to
240 volts AC).
3. Obtain a 19-inch (48.3-cm) cabinet or rack to fit shelves of this size (without cables):
Height
Width
Depth
Maximum weight
1.70 in.
(4.32 cm)
17.32 in.
(44.0 cm)
32.0 in.
(81.3 cm)
39 lb.
(17.7 kg)
4. Decide where you are going to install the appliance.