-
xvii
-
1.7.8 Attachment of label plate
1.8 Removal of shipment Stabilizer
................................................................................................. 26
2.1 Connection of a Interface Cable
................................................................................................ 27
2.2 Connection of AC Power Cable
................................................................................................ 29
2.4 Setting Drive configuration
2.5 Setting Library and Drive configuration
..................................................................................... 29
2.7 Operation Checks after Installation
............................................................................................ 30
Chapter3 Power-On and Power-Off
............................................................................................ 31
3.1 Power-On and Power-On Sequence
........................................................................................... 31
3.4 Power-Off and Power-Off Sequence
.......................................................................................... 31
4.1.3 Asynchronization message screen
....................................................................................... 39
4.5.1 Viewing Configuration data of the library
............................................................................ 57
4.5.3.1 Setting of Serial Attached SCSI
..................................................................................... 59
4.5.3.2 Setting of Fibre Channel
............................................................................................... 60
4.5.3.3 Setting robot control path
.............................................................................................. 61
4.5.4 Switching between ONLINE and OFFLINE
........................................................................ 62