Setting Up the System 2-3
Unpacking the System
!
WARNING
Your system weighs approximately 132 pounds (60 kg). If
your system contains numerous optional boards and
peripheral devices, it will weigh more. To avoid personal
injury, make sure you have someone help you lift or move
the system.
When you receive your system if the shipping boxes are damaged, note the
damage, and if possible, photograph it for reference. After removing the
contents of the containers, keep the cartons and the packing materials. If the
contents appear damaged when you unpack the boxes, file a damage claim with
the carrier immediately.
Rack-Mount System Assembly
This section provides the instructions for assembling the rack-mount server unit
into a standard EIA 19-inch rack cabinet.
Unpacking the Rack Mounting Hardware
Although the rack mounting hardware is inspected and carefully packaged at the
factory, damage may occur during shipping. Follow these steps for unpacking.
1.
Visually inspect the shipping containers; notify your carrier immediately of
any damage.
2.
Carefully remove the rack mounting hardware and verify the parts. See
Figure 2-1 and Table 2-1. If parts are missing or the hardware is damaged,
notify your service representative.
A
B
C
D
Figure 2-1. Rack Mounting Hardware
Summary of Contents for Express5800 320La
Page 1: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 2: ...NEC...
Page 3: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 40: ...1 26 System Overview...
Page 55: ...Setting Up the System 2 15 Figure 2 10 UPS AC Power Cord with 30 amp plug L5 30P...
Page 60: ...2 20 Setting Up the System...
Page 154: ...4 68 CRU Replacement and Server Upgrades...
Page 185: ...A Technical Specifications Server Unit...
Page 188: ...A 4 Technical Specifications...
Page 189: ...B ROMPilot BIOS Error Codes ROMPilot BIOS Error Codes...
Page 192: ...B 4 ROMPilot BIOS Error Codes...
Page 202: ...10 Glossary...
Page 205: ...xx...
Page 206: ...456 01572 N00...