![background image](http://html1.mh-extra.com/html/nec/express5800-320la/express5800-320la_user-manual_3907234140.webp)
4-54
CRU Replacement and Server Upgrades
Installing the Internal Device Bay Expansion Kit
1.
Mount the power supply unit by placing it at the rear of the tape drive
module frame and engaging its bottom mounting tabs with its corresponding
frame brackets, and then secure it with two screws. See Figure 4-65.
Figure 4-65. Mounting the Power Supply Unit
2.
Connect the device DC power distribution cable and the white/black cable
(Power Good sensor cable) coming from inside the server (taped to the
bottom of the tape drive module frame) to the power unit. See Figure 4-66.
A
B
A
Device DC power distribution cable
B
White/black cable (PowerGood sensor cable)
Figure 4-66. Connecting the Device DC Power Distribution and White/Black Cables
Summary of Contents for Express5800 320La
Page 1: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 2: ...NEC...
Page 3: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 40: ...1 26 System Overview...
Page 55: ...Setting Up the System 2 15 Figure 2 10 UPS AC Power Cord with 30 amp plug L5 30P...
Page 60: ...2 20 Setting Up the System...
Page 154: ...4 68 CRU Replacement and Server Upgrades...
Page 185: ...A Technical Specifications Server Unit...
Page 188: ...A 4 Technical Specifications...
Page 189: ...B ROMPilot BIOS Error Codes ROMPilot BIOS Error Codes...
Page 192: ...B 4 ROMPilot BIOS Error Codes...
Page 202: ...10 Glossary...
Page 205: ...xx...
Page 206: ...456 01572 N00...