CRU Replacement and Server Upgrades 4-9
4.
Remove the lower front cover by repeating step 3 above.
Figure 4-3. Removing the Front Covers
To install the front covers of the rack-mount system, perform the following.
1.
Observe the safety and ESD precautions listed at the beginning of this
chapter.
2.
Install the lower front cover first and then the upper one. See Figure 4-4.
To install the lower and upper front covers fasten the tab on the left hand-
side of each of the front covers to the server.
3.
Lock the upper front cover by inserting the security key into the lock, which
is located approximately half way up on the right-hand side of the front
door, and turning the key clockwise a quarter turn. See Figure 4-1.
Figure 4-4. Installing the Front Covers
Summary of Contents for Express5800 320La
Page 1: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 2: ...NEC...
Page 3: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 40: ...1 26 System Overview...
Page 55: ...Setting Up the System 2 15 Figure 2 10 UPS AC Power Cord with 30 amp plug L5 30P...
Page 60: ...2 20 Setting Up the System...
Page 154: ...4 68 CRU Replacement and Server Upgrades...
Page 185: ...A Technical Specifications Server Unit...
Page 188: ...A 4 Technical Specifications...
Page 189: ...B ROMPilot BIOS Error Codes ROMPilot BIOS Error Codes...
Page 192: ...B 4 ROMPilot BIOS Error Codes...
Page 202: ...10 Glossary...
Page 205: ...xx...
Page 206: ...456 01572 N00...