![background image](http://html1.mh-extra.com/html/nec/express5800-320la/express5800-320la_user-manual_3907234128.webp)
4-42
CRU Replacement and Server Upgrades
Figure 4-53. Engaging the Carrier Lock Lever
10.
Push the lock lever toward the hard disk drive bay until the handle is
completely locked. The lever clicks when it is locked. See Figure 4-54.
Incorrect Correct
Figure 4-54. Securing the Hard Disk Drive Carrier
11.
Close and lock the front door on the tower cabinet or front covers on the
rack-mount system. See
Opening and Closing the Front Door of the Tower
Cabinet
earlier in this chapter or
Removing and Installing the Front Covers
of the Rack-Mount System
earlier in this chapter.
Summary of Contents for Express5800 320La
Page 1: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 2: ...NEC...
Page 3: ...U s e r s G u i d e EXPRESS5800 320La 320La R...
Page 40: ...1 26 System Overview...
Page 55: ...Setting Up the System 2 15 Figure 2 10 UPS AC Power Cord with 30 amp plug L5 30P...
Page 60: ...2 20 Setting Up the System...
Page 154: ...4 68 CRU Replacement and Server Upgrades...
Page 185: ...A Technical Specifications Server Unit...
Page 188: ...A 4 Technical Specifications...
Page 189: ...B ROMPilot BIOS Error Codes ROMPilot BIOS Error Codes...
Page 192: ...B 4 ROMPilot BIOS Error Codes...
Page 202: ...10 Glossary...
Page 205: ...xx...
Page 206: ...456 01572 N00...