13
5.2
ASSEMBLY (CONNECTIONS)
5.2.1
CONNECTION TO THE REFRIGERANT CIRCUIT (CONSUMER CIRCUIT)
All work may only be carried out by specialist personnel!
Procedure:
-
In closed systems, make sure that the maximum obtainable cooling medium pressure in the supply
line does not cause a higher pressure level than the maximum permitted for the chiller.
-
Check the cleanliness of the supply line and the piping system to be connected.
-
Connect the chiller with the consumer circuit; the identification of the joints (cooling medium in-
let/outlet) is indicated on the chiller by means of the symbols described in the introduction to the
manual.
-
Make all the connections, without rotating the sleeves located on the hose.
The cooling medium circuits of the Series PCGE and PCGEZ with tank are open to the at-
mophere as standard!
Use piping, connections and fastening components with a cross-section to match the capacity of the chiller and the
possible volume flow. This should not be smaller than the diameter of the chiller connections.
In the case of rigid connections, check during the initial start-up of the chiller that it is not subject to any vibrations
that might endanger the integrity of the components.
We also recommend that you should plan to install the following system components:
Ü
A bypass system with suitable valves upstream and downstream of the chiller. This is intended to allow use
of the consumer circuit if you have to remove the chiller from the circuit, switch it off or use it in different
ways at the same time
.
Ü
A pipeline system with integrated filter near the chiller to protect the pump against solid matter and avoid
deposits on the heat exchangers. The recommended mesh width for the chillers is 25
µ
with a maximum
pressure loss at the filter of 1 bar
.
The use of a filter with a mesh width of 60
µ
is particularly suitable for
chillers of the OGCE series if they are fitted with a gear pump, so as to avoid unusual wear of the compo-
nent.
Ü
In the models without flow monitoring, we suggest that you should install such a component if the system
exhibits losses or very high cooling medium consumption due to evaporation or intervention by the opera-
tor. A further reason may be triggering of the solenoid valve to shut down the system. The flow meter may
trigger an alarm and enable immediate operator intervention.
Ü
On no account may the total pressure loss of the system exceed a value above that of the pump perfor-
mance.
Ü
Another option for directly filling the tank involves attaching a T-fitting to the cooling medium outlet fitting
in order to connect the cooling medium circuit with a supply pipe. This is used to fill the chiller. We also
recommend connecting a valve to the supply pipe in order to stop the flow when the tank is full or to re-
start the flow as soon as a top-up is necessary.
Fig.1
A
Male-male fitting
B
From the supply line
C
To the consumer cooling circuit
D
T-fitting
E
Connecting piece to cooling medium outlet
Summary of Contents for OCGE 111
Page 69: ...69 11 2 WIRING DIAGRAM MODELS PCGE 11 to PCGE 25 PCGEZ 08 230V 1Ph 50Hz POWER COMMAND DIAGRAM ...
Page 70: ...70 MODEL PCGE 28 230V 1Ph 50Hz POWER COMMAND DIAGRAM ...
Page 71: ...71 MODEL PCGE 28 400V 3Ph 50Hz POWER COMMAND DIAGRAM ...
Page 72: ...72 MODELS PCGE 31 to PCGE 41 OCGE 31 to OCGE 41 230V 1Ph 50Hz POWER SECTION ...
Page 73: ...73 MODELS PCGE 31 to PCGE 41 OCGE 31 to OCGE 41 230V 1Ph 50Hz COMMAND SECTION ...
Page 78: ...78 MODELS PCGE 590 to PCGE 3300 PCGEZ 360 to PCGEZ 480 400V 3Ph 50Hz ...
Page 79: ...79 ...
Page 80: ...80 ...
Page 81: ...81 ...
Page 86: ...86 MODEL PCGE 1100 with tank and pump MODEL PCGE 1300 with tank and pump ...
Page 87: ...87 MODEL PCGE 1900 2200 with tank and pump MODEL PCGE 2900 3300 with tank and pump ...
Page 91: ...91 MODEL PCGE 1100 without tank MODEL PCGE 1300 without tank ...
Page 92: ...92 MODEL PCGE 1900 2200 without tank MODEL PCGE 2900 3300 without tank ...
Page 97: ...97 710 1789 00 00 02B 轜 07 05 2008 ...
Page 166: ...69 11 2 WIRING DIAGRAM MODELS PCGE 11 to PCGE 25 PCGEZ 08 230V 1Ph 50Hz POWER COMMAND DIAGRAM ...
Page 167: ...70 MODEL PCGE 28 230V 1Ph 50Hz POWER COMMAND DIAGRAM ...
Page 168: ...71 MODEL PCGE 28 400V 3Ph 50Hz POWER COMMAND DIAGRAM ...
Page 169: ...72 MODELS PCGE 31 to PCGE 41 OCGE 31 to OCGE 41 230V 1Ph 50Hz POWER SECTION ...
Page 170: ...73 MODELS PCGE 31 to PCGE 41 OCGE 31 to OCGE 41 230V 1Ph 50Hz COMMAND SECTION ...
Page 175: ...78 MODELS PCGE 590 to PCGE 3300 PCGEZ 360 to PCGEZ 480 400V 3Ph 50Hz ...
Page 176: ...79 ...
Page 177: ...80 ...
Page 178: ...81 ...
Page 183: ...86 MODEL PCGE 1100 with tank and pump MODEL PCGE 1300 with tank and pump ...
Page 184: ...87 MODEL PCGE 1900 2200 with tank and pump MODEL PCGE 2900 3300 with tank and pump ...
Page 188: ...91 MODEL PCGE 1100 without tank MODEL PCGE 1300 without tank ...
Page 189: ...92 MODEL PCGE 1900 2200 without tank MODEL PCGE 2900 3300 without tank ...