3) One Pulse Type Signal ( select "2" on P80 )
It starts counting number of screw on receipt of pulse signal. There is no Count Stop
signal. When the counting reaches to the target, it will provide the count complete OK
output signal.
But if the time after start is limited on P81, SDC will verify NG at the set time.
If the fastening is not complete till the set time, it will verify NG with the error code
E r 3 1 1
for 3 seconds and will display the remaining number.
It can be clear to the target by pressing RESET
but
t
on
E
x
a
m
p
l
e
#
1 )
C
o
u
nt start pulse signal with time limit
Example #2 ) Count start pulse signal
without
time limit
Without the fastening time limit after Start on P81, it can be a useful application with
a pallet conveyor system with stopper as shown below. The stopper does not go
down keeping the work piece in work area. If there is no Count complete
OK signal from the SDC.
1080 N 11th St - San Jose CA 95112 - mountztorque.com
66
Summary of Contents for SDC-24
Page 12: ...SD400 SD600 SD1000 SD1500 SD18N SD28N 1080 N 11th St San Jose CA 95112 mountztorque com 12...
Page 69: ...2 Direct Wiring to 25P I O Interface Port 1080 N 11th St San Jose CA 95112 mountztorque com 69...
Page 90: ...9 Screw Count Monitoring Single 1080 N 11th St San Jose CA 95112 mountztorque com 90...