7.11.2 25P I/O Configuration (II) - for PLC
[ P20 Setting ] " 1 " :
Remote Control I/O for PLC
“
3 “ : Remote Control I/O for PLC (Except Pin no.4 and no.6)
“ 5 “ : Remote Control I/O for PLC (Except Pin no.4-by manual operation)
PIN no.
Configuration
IN / OUT
1
Torque select IN1
INPUT
(to Controller)
2
Torque select IN2
3
Torque select IN3
4
START (only for P20=1)
5
Driver Lock (P86 : 0 )
Angle count start by signal (P86 : 1)
6
F/R (For: 0, Rev: 1) (only for P20=1)
7
Model select IN3
8
Multi-sequence (8-1) MA:1-0, MB:1-1
9
Reset ( include cycle reset )
or Work-piece move OUT from area
(P80 "3" selected )
19
Work-piece move IN to area
23
Model select IN1
24
Model select IN2
10
Error code OUT1
OUTPUT
(to Controller)
11
Error code OUT2
12
Error code OUT3
13
Error code OUT4
14
Status of F/R OUT (F:0, R:1)
15
Torque up
( without verifying result )
16
Status of Motor Run OUT
17
READY
18
ALARM (NG)
20
Cycle count complete
25
Fastening OK OUT
( Verifying OK )
21
Outpu
t COM
22
Input COM
1080 N 11th St - San Jose CA 95112 - mountztorque.com
56
Summary of Contents for SDC-24
Page 12: ...SD400 SD600 SD1000 SD1500 SD18N SD28N 1080 N 11th St San Jose CA 95112 mountztorque com 12...
Page 69: ...2 Direct Wiring to 25P I O Interface Port 1080 N 11th St San Jose CA 95112 mountztorque com 69...
Page 90: ...9 Screw Count Monitoring Single 1080 N 11th St San Jose CA 95112 mountztorque com 90...