IX
Troubleshooting ]
- 355 -
HWE09080
GB
5. LEV
6. Solenoid
valve
Work procedure
Explanatory figure
(1) Remove the service panel.(Refer to 1. 1) - 3)
(2) Replace the LEV in trouble.
Secure enough service space in the ceiling for welding
operation, and conduct the work carefully.If required,
dismount the unit from the ceiling, and conduct the work.
*Special care must be taken when replacing heavy parts.
Work procedure
Explanatory figure
(1) Remove the service panel.(Refer to 1. 1) - 3)
(2) Remove the connector of the solenoid valve in trou-
ble.
(3) Remove the solenoid valve coil.
1) The coils on the solenoid valves SVA, SVB, SVM1 and
SVM2 can be serviced through the inspection door. SVC
is accessible for replacement by removing the four
mounting screws on the rear panel and removing the
panel (if enough space is available on the back). (SVM1
is present only on the G and GA types, SVM2 on the GA
type.)
LEV3
LEV1
LEV2
SVM2
SVM2b
CMB-1016NU-G
Double-pipe heat exchanger
CMB-1016NU-GA
Solenoid valve
Summary of Contents for PQHY-P120THMU-A
Page 1: ......
Page 11: ... 2 ...
Page 25: ... 16 ...
Page 83: ... 74 ...
Page 103: ... 94 III Heat source Unit Components GB HWE09080 ...
Page 105: ... 96 ...
Page 113: ... 104 IV Remote Controller GB HWE09080 ...
Page 115: ... 106 ...
Page 131: ... 122 ...
Page 143: ... 134 VI Refrigerant Circuit GB HWE09080 ...
Page 145: ... 136 ...
Page 181: ... 172 VII Control GB HWE09080 ...
Page 183: ... 174 ...
Page 235: ... 226 ...
Page 367: ... 358 ...
Page 414: ......