4. Thickness and refrigerant type indicated on the piping materials
Ask the pipe manufacturer for the symbols indicated on the piping material for new refrigerant.
5. Flare processing (O-material (Annealed) and OL-material only)
The flare processing dimensions for the pipes that are used in the R410A system are larger than those in the R22 system.
(ø19.05 pipes should have a radial thickness of 1.2 t and be made of annealed materials.)
If a clutch-type flare tool is used to flare the pipes in the system using R410A, the length of the pipes must be between 1.0
and 1.5 mm. For margin adjustment, a copper pipe gauge is necessary.
6. Flare
nut
The flare nut type has been changed to increase the strength. The size of some of the flare nuts have also been changed.
The figures in the radial thickness column are based on the Japanese standards and provided only as a reference. Use pipes
that meet the local standards.
Flare processing dimensions (mm[in])
Pipe size (mm[in])
A dimension (mm)
R410A
R22, R407C
ø6.35
[1/4"]
9.1
9.0
ø9.52
[3/8"]
13.2
13.0
ø12.7
[1/2"]
16.6
16.2
ø15.88
[5/8"]
19.7
19.4
ø19.05
[3/4"]
24.0
23.3
Flare nut dimensions (mm[in])
Pipe size (mm[in])
B dimension (mm)
R410A
R22, R407C
ø6.35
[1/4"]
17.0
17.0
ø9.52
[3/8"]
22.0
22.0
ø12.7
[1/2"]
26.0
24.0
ø15.88
[5/8"]
29.0
27.0
ø19.05
[3/4"]
36.0
36.0
Dimension A
Dimension B
Summary of Contents for PQHY-P120THMU-A
Page 1: ......
Page 11: ... 2 ...
Page 25: ... 16 ...
Page 83: ... 74 ...
Page 103: ... 94 III Heat source Unit Components GB HWE09080 ...
Page 105: ... 96 ...
Page 113: ... 104 IV Remote Controller GB HWE09080 ...
Page 115: ... 106 ...
Page 131: ... 122 ...
Page 143: ... 134 VI Refrigerant Circuit GB HWE09080 ...
Page 145: ... 136 ...
Page 181: ... 172 VII Control GB HWE09080 ...
Page 183: ... 174 ...
Page 235: ... 226 ...
Page 367: ... 358 ...
Page 414: ......