[
IX
Troubleshooting ]
- 321 -
HWE09080
GB
3. Troubleshooting flow chart for LEV Solenoid valve
(1) LEV
Check whether the electric expansion
valve and the solenoid valve connector
are not disconnected or not loose.
Run the cooling operation or the heating
operation in the system in trouble
(only in one system).
No cooling capacity
No heating capacity
Repair the fault.
Fault is found.
Note 1
NO
Check that LEV1 is fully open.
Check that LEV1 is fully open.
Check that SVA and SVC are ON.
Check that SVA and SVC are OFF.
Cooling or heating operation
Note 2
Heating operation
Check whether LEV3 is controlling
superheat.
Check LEV1.
Check LEV3.
Check SVA and SVC.
Check SVB.
LEV1 is fully open.
Check whether LEV 3 is controlled by
the value of the differential pressure.
LEV1 is fully open.
Note 3
Note 2
Note 3
YES
NO
Cooling operation
Superheat control OK
Differential pressure OK
YES
NO
Check that SVB is OFF.
Check that SVB is ON.
SVA, SVC ON
SVA, SVC OFF
YES
YES
NO
Completed
SVB OFF
SVB ON
YES
YES
YES
YES
NO
NO
NO
NO
NO
Summary of Contents for PQHY-P120THMU-A
Page 1: ......
Page 11: ... 2 ...
Page 25: ... 16 ...
Page 83: ... 74 ...
Page 103: ... 94 III Heat source Unit Components GB HWE09080 ...
Page 105: ... 96 ...
Page 113: ... 104 IV Remote Controller GB HWE09080 ...
Page 115: ... 106 ...
Page 131: ... 122 ...
Page 143: ... 134 VI Refrigerant Circuit GB HWE09080 ...
Page 145: ... 136 ...
Page 181: ... 172 VII Control GB HWE09080 ...
Page 183: ... 174 ...
Page 235: ... 226 ...
Page 367: ... 358 ...
Page 414: ......