IX
Troubleshooting ]
- 353 -
HWE09080
GB
[7] Servicing the BC controller
1. Service
panel
2. Control
box
*Special care must be taken when replacing heavy parts.
Work procedure
Explanatory figure
1) Remove the two lock nuts on the control box, loosen the
other two, and remove the control box.
2) Remove the three fixing screws on the service panel,
and remove the service panel.
3) Remove the nine machine screws on the ceiling panel,
and remove the ceiling panel.
Work procedure
Explanatory figure
(1) To check the inside of the control box, remove the
two lock nuts on the control box cover.
1) Check the terminal connection of the power wire or of
the transmission line.
2) Check the transformer.
3) Check the address switch.
(2) When the control board is replaced, the followings
must be noted.
(1) Check that the board type is G,GA, or GB(HB).
(2) Check that the wire and the connector are properly con-
nected.
It is not required to remove the two fixing screws on the
control box when checking the inside.
Loosen
Service panel
Control Box
Ceiling panel
CMB-1016NU-G, GA
Summary of Contents for PQHY-P120THMU-A
Page 1: ......
Page 11: ... 2 ...
Page 25: ... 16 ...
Page 83: ... 74 ...
Page 103: ... 94 III Heat source Unit Components GB HWE09080 ...
Page 105: ... 96 ...
Page 113: ... 104 IV Remote Controller GB HWE09080 ...
Page 115: ... 106 ...
Page 131: ... 122 ...
Page 143: ... 134 VI Refrigerant Circuit GB HWE09080 ...
Page 145: ... 136 ...
Page 181: ... 172 VII Control GB HWE09080 ...
Page 183: ... 174 ...
Page 235: ... 226 ...
Page 367: ... 358 ...
Page 414: ......