[6-5 Initialization Procedure for System Rotation Settings ]
BS_06_C
chapter 6 -
13
6 Tes
t Ru
n
5. Cautions when service/maintenance
Following are procedures for service/maintenance to continue system rotation function after service /
maintenance.
(1) In case you would like to shutdown power supply to unit to do maintenance.
1) In case shutdown power supply to back-up unit to do maintenance
Switch SW9 from “Normal” to “Local” on the back up unit
Shutdown power supply to back-up unit, then do maintenance
Restore power supply to back-up unit
Switch SW9 to “Normal”
2) In case you would like to shutdown power supply to other than back-up unit to do maintenance.
Switch SW9 from “Normal” to “Local” on the back up unit
Run backup-unit via remote controller
Switch SW9 to from “Normal” to “Local” on the unit to be maintained
Stop the unit you would like to do maintenance via remote controller
Shutdown power supply to the unit, and do maintenance.
Restore power supply to the unit and run the unit via remote controller
Switch SW9 on the unit from “Local” to “Normal”
Stop back-up unit via remote controller
Switch SW9 from “Local” to “Normal”
Note: If no need to run back up unit during maintenance, step #1, 2, 8 and 9 are no need.
(2) In case you would like to restore error occurring unit.
1) Switch SW9 from “Normal” to “Local” on the error unit
2) Stop the error unit via remote controller
3) Shutdown power supply to the unit
4) Fix the error.
5) Restore power supply to the unit
6) Run the unit via remote controller
7) Switch SW9 from “Local” to “Normal”, then back up unit will automatically stop within 3 minutes.
(3) In case you would like to restore system rotation function after mistakenly manually operated
despite switch SW9 is set as “Normal”.
1) In case you would like to continue the current rotation order
In case backup unit was manually operated
Leave the unit in operation
Leave SW9 as “Normal” on all the units
Then, back up unit will automatically stop after the elapse of a certain period of time (Max 480hrs)
In case other than backup unit was manually stopped
Run the unit that was manually stopped
Leave SW9 as “Normal” on the all the units, then system rotation will work continuously.
2) In case you would like to do set-up from the beginning
Run all the units via remote controller
Stop the smallest address unit in the group via remote controller
Turn DipSW5-10 on outdoor unit from “ON” to “OFF”
Turn DipSW5-10 on outdoor unit from “OFF” to “ON”
Run all the units via remote controller
Switch SW9 to “Normal” on the all the units
Then second smallest address unit will automatically stop as a backup unit within 3 minutes.
6. Other cautions
(1) In case error occurs which go into emergency operation, the backup unit will not start.
(2) In case error occurs at even numbered address unit and other than control unit, max 7 minutes
will take for backup unit to start
0000004496.BOOK 13 ページ 2017年12月26日 火曜日 午前11時45分
Summary of Contents for PFD-P250VM-E
Page 11: ...GB_BS_01_C 0000004491 BOOK 2 ページ 2017年12月26日 火曜日 午後1時10分 ...
Page 27: ...GB_BS_02_C 0000004492 BOOK 2 ページ 2018年1月5日 金曜日 午前10時12分 ...
Page 49: ...GB_BS_03_C 0000004493 BOOK 2 ページ 2018年1月5日 金曜日 午前9時11分 ...
Page 71: ...GB_BS_04_C 0000004494 BOOK 2 ページ 2017年12月26日 火曜日 午前11時43分 ...
Page 89: ...GB_BS_05_C 0000004495 BOOK 2 ページ 2017年12月26日 火曜日 午前11時44分 ...
Page 117: ...GB_BS_06_C 0000004496 BOOK 2 ページ 2017年12月26日 火曜日 午前11時45分 ...
Page 281: ...GB_BS_09_A1 0000004538 BOOK 2 ページ 2017年12月25日 月曜日 午後7時48分 ...
Page 299: ...GB_BS_10_C 0000004550 BOOK 2 ページ 2017年12月26日 火曜日 午後12時1分 ...