[2-6 System Connection Example ]
10
-
chapter 2
BS_02_C
2
Rest
rict
io
ns
2-6
System Connection Example
Examples of typical system connection are shown below.
Refer to the Installation Manual that came with each device or controller for details.
(1) An example of a system to which an MA remote controller is connected
System
configuration
Connection to the system controller
Address start up for in-
door and outdoor units
Notes
1
System with one out-
door unit
NO
Manual
address setup
2
Grouping of units in a
system with multiple
outdoor units
NO
Manual
address setup
3
System with one out-
door unit
With connection to transmission line
for centralized control
Manual
address setup
4
System with one out-
door unit
(P250YNW only or
P500YSNW only)
With connection to indoor-outdoor
transmission line
Manual
address setup
5
Grouping of units in a
system with multiple
outdoor units
With connection to transmission line
for centralized control
Manual
address setup
0000004492.BOOK 10 ページ 2018年1月5日 金曜日 午前10時12分
Summary of Contents for PFD-P250VM-E
Page 11: ...GB_BS_01_C 0000004491 BOOK 2 ページ 2017年12月26日 火曜日 午後1時10分 ...
Page 27: ...GB_BS_02_C 0000004492 BOOK 2 ページ 2018年1月5日 金曜日 午前10時12分 ...
Page 49: ...GB_BS_03_C 0000004493 BOOK 2 ページ 2018年1月5日 金曜日 午前9時11分 ...
Page 71: ...GB_BS_04_C 0000004494 BOOK 2 ページ 2017年12月26日 火曜日 午前11時43分 ...
Page 89: ...GB_BS_05_C 0000004495 BOOK 2 ページ 2017年12月26日 火曜日 午前11時44分 ...
Page 117: ...GB_BS_06_C 0000004496 BOOK 2 ページ 2017年12月26日 火曜日 午前11時45分 ...
Page 281: ...GB_BS_09_A1 0000004538 BOOK 2 ページ 2017年12月25日 月曜日 午後7時48分 ...
Page 299: ...GB_BS_10_C 0000004550 BOOK 2 ページ 2017年12月26日 火曜日 午後12時1分 ...