5.4 Precautions for Wiring/Connecting the EMC Directive-Compliant
Product
5
- 19
1
OV
E
R
VI
EW
2
S
YSTE
M
CONF
IGURA
TION
3
S
P
E
CI
F
ICA
T
ION
S
4
P
A
R
T
NA
ME
AND
SETTING
S
5
EMC AND
LO
W
VO
LT
AG
E
DIRE
CT
IVE
6
INS
TAL
L
A
TI
ON
7
WIRING
8
OP
TIO
N
(3) MELSECNET/H connection (PLC to PLC network) and MELSECNET/10 connction (PLC to PLC
network)
(a) For coaxial cable
• Strip the outer insulation layer at both ends of the cable by the length shown below to expose
the outer braided shield for grounding. (For grounding with cable clamps (refer to Section
5.4.3.))
• Attach ferrite cores to the cable in the positions as illustrated below.
(b) For optical fiber cable
• Processing of the cable is not required.
(4) CC-Link connection (Intelligent device station)
Strip the outer insulation layer at both ends of the cable by the length shown below to expose the
braided shield for grounding. (For grounding with cable clamps (refer to Section 4.4.3.))
• Attach ferrite cores to the cable in the positions as illustrated below.
• CC-Link dedicated cable for connecting the GOT and PLC.
• CC-Link dedicated cable for connecting the GOT and GOT
(ZCAT3035-1330)
GOT side
130 or
less
130 or
less
230 or less
Ferrite Core
(5.12)
(5.12)
(9.06)
Unit : mm (inch)
(1.57)
40
(1.57)
40
400 or less
(15.75)
PLC side
GOT side
230 or less
(9.06)
(1.57)
40
(ZCAT3035-1330)
Ferrite Core
(1.57)
40
400 or less
(15.75)
PLC side
130
(5.12)
130
(5.12)
Unit : mm (inch)
GOT side
GOT side
230 or less
(9.06)
230 or less
(9.06)
(1.57)
40
(ZCAT3035-1330)
Ferrite Core
(1.57)
40
Unit : mm (inch)
130
(5.12)
130
(5.12)