5.4 Precautions for Wiring/Connecting the EMC Directive-Compliant
Product
5
- 17
1
OV
E
R
VI
EW
2
S
YSTE
M
CONF
IGURA
TION
3
S
P
E
CI
F
ICA
T
ION
S
4
P
A
R
T
NA
ME
AND
SETTING
S
5
EMC AND
LO
W
VO
LT
AG
E
DIRE
CT
IVE
6
INS
TAL
L
A
TI
ON
7
WIRING
8
OP
TIO
N
5.4.2
Processing connection cables
Process the cable used with the GOT with the following method.
When processing the cable, ferrite core, cable clamp and shielding material are required.
The cable clamp used by Mitsubishi Electric for the EMC specification compatibility test is shown below.
• TDK corporation brand ZCAT3035-1330 Ferrite Core
• Mitsubishi Electric Model AD75CK cable clamp
• Japan Zipper Tubing Co., Ltd. Zipper tube SHNJ type
(1) BUS connection cable
(a) For GT15-QC B, GT15-QC BS
• Peel the sheath (with the length shown below) at both ends of the cable, and expose the
shield braided wire for grounding. (For grounding with cable clamps. (refer to Section 5.4.3.))
(b) For GT15-C BS
• Cut the connection wire protruding from both ends of the cable to the lengths shown below.
• Attach the ferrite core to the cable in the position as illustrated below and insert the ground
wire into the ferrite core.
• Peel the sheath (with the length shown below) at both ends of the cable, and expose the
shield braided wire for grounding. (For grounding with cable clamps. (refer to Section 5.4.3.))
Unit : mm (inch)
360 or less
(14.17)
360 or less
(14.17)
(1.57)
(1.57)
40
40
GOT side
PLC/GOT side
60 or less
GOT side
PLC/GOT side
Ferrite Core
(ZCAT3035-1330)
360 or less
(2.36)
(14.17)
(1.57)
40
60 or less
360 or less
(2.36)
(14.17)
(1.57)
40
Unit : mm (inch)
Ground wires
(280mm (11.0 inch))