4.7. Installation report
When first installed, the installer must fill in all parts of the following installation report and
send it to "Angelo Po" within 7 days for the activation of the Warranty.
It presents data connection, and in particular must show the power supply, if possible, the
mains water pressure (and other available data, e.g. Water hardness or presence of water
treatment system) and the type of vent (if directly under a hood or connection).
The type of gas and the combustion gas analysis must be indicated.
Place here a magnet during
the gas flue analysis
Summary of Contents for ANGELO PO COMBISTAR FX
Page 1: ...1 Rev 0 ...
Page 6: ...Copyright by Servizio Clienti ANGELO PO Spa 6 1 COMMERCIAL MODEL NUMBER ...
Page 7: ...Copyright by Servizio Clienti ANGELO PO Spa 7 FX Models table ...
Page 10: ...Copyright by Servizio Clienti ANGELO PO Spa 10 OVEN CONNECTION DIAGRAM FX 61 G3 ...
Page 19: ...Copyright by Servizio Clienti ANGELO PO Spa 19 2 4 Steam producing operation injectors code ...
Page 21: ...Copyright by Servizio Clienti ANGELO PO Spa 21 ...
Page 44: ...Copyright by Servizio Clienti ANGELO PO Spa 44 ...
Page 46: ...Copyright by Servizio Clienti ANGELO PO Spa 46 Fuses on Power Board ...
Page 61: ...Copyright by Servizio Clienti ANGELO PO Spa 61 ...
Page 67: ...Copyright by Servizio Clienti ANGELO PO Spa 67 Functional diagram gas system ...
Page 104: ...Copyright by Servizio Clienti ANGELO PO Spa 104 ...
Page 151: ...Copyright by Servizio Clienti ANGELO PO Spa 151 PICTURE 7 PICTURE 8 PICTURE 5 PICTURE 6 ...
Page 162: ...Copyright by Servizio Clienti ANGELO PO Spa 162 6 15 Roll In adjustment RX201 RX202 ...
Page 163: ...Copyright by Servizio Clienti ANGELO PO Spa 163 ...