![Manitowoc Marine Q 1000 Service Technician'S Handbook Download Page 24](http://html.mh-extra.com/html/manitowoc/marine-q-1000/marine-q-1000_service-technicians-handbook_701044024.webp)
–14–
Freeze Sequence
3. Prechill
The compressor is on for 30 seconds prior to water
flow to prechill the evaporator.
4. Freeze
The water pump restarts after the 30-second prechill.
An even flow of water is directed across the
evaporator and into each cube cell, where it freezes.
The water fill valve will cycle on, then off one more
time to refill the water trough.
When sufficient ice has formed, the water flow (not the
ice) contacts the ice thickness probe. After
approximately 7 seconds of continual water contact,
the Harvest sequence is initiated. The ice machine
cannot initiate a Harvest sequence until a 6-minute
freeze lock has been surpassed.
Summary of Contents for Marine Q 1000
Page 1: ... Manitowoc Ice Inc P N 80 1099 9 8 03 ...
Page 2: ......
Page 10: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ... 9 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ... 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ... 24 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 79: ... 69 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ... 70 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ... 104 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 173: ... 163 SV1406 FIG A PINCHING OFF TUBING FIG B RE ROUNDING TUBING USING PINCH OFF TOOL ...
Page 177: ......
Page 178: ......