–151–
2. Close the vacuum pump valve, the low side service
valve, and the low side manifold gauge valve.
3. Open the high side manifold gauge valve, and
backseat the high side service valve.
4. Open the charging cylinder and add the proper
refrigerant charge (shown on nameplate) through
the discharge service valve.
5. Let the system “settle” for 2 to 3 minutes.
6. Place the toggle switch in the ICE position.
7. Close the high side on the manifold gauge set. Add
any remaining vapor charge through the suction
service valve (if necessary).
NOTE:
Manifold gauges must be removed properly to
ensure that no refrigerant contamination or loss
occurs.
8. Make sure that all of the vapor in the charging
hoses is drawn into the ice machine before
disconnecting the charging hoses.
A. Run the ice machine in freeze cycle.
B. Close the high side service valve at the ice
machine.
C. Open the low side service valve at the ice
machine.
D. Open the high and low side valves on the
manifold gauge set. Any refrigerant in the lines
will be pulled into the low side of the system.
E. Allow the pressures to equalize while the ice
machine is in the freeze cycle.
F. Close the low side service valve at the ice
machine.
G. Remove the hoses from the ice machine and
install the caps.
Summary of Contents for Marine Q 1000
Page 1: ... Manitowoc Ice Inc P N 80 1099 9 8 03 ...
Page 2: ......
Page 10: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ... 9 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ... 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ... 24 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 79: ... 69 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ... 70 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ... 104 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 173: ... 163 SV1406 FIG A PINCHING OFF TUBING FIG B RE ROUNDING TUBING USING PINCH OFF TOOL ...
Page 177: ......
Page 178: ......