–119–
CYCLE TIMES/24-HOUR ICE PRODUCTION/
REFRIGERANT PRESSURE CHARTS
These charts are used as guidelines to verify correct
ice machine operation.
Accurate collection of data is essential to obtain the
correct diagnosis.
•
Refer to “OPERATIONAL ANALYSIS TABLE” for the
list of data that must be collected for refrigeration
diagnostics. This list includes: before beginning
service, ice production check, installation/visual
inspection, water system checklist, ice formation
pattern, safety limits, comparing evaporator inlet/
outlet temperatures, discharge and suction pressure
analysis.
•
Ice production checks that are within 10% of the
chart are considered normal. This is due to
variances in water and air temperature. Actual
temperatures will seldom match the chart exactly.
•
Zero out manifold gauge set before obtaining
pressure readings to avoid misdiagnosis.
•
Discharge and suction pressure are highest at the
beginning of the cycle. Suction pressure will drop
throughout the cycle. Verify the pressures are within
the range indicated.
Summary of Contents for Marine Q 1000
Page 1: ... Manitowoc Ice Inc P N 80 1099 9 8 03 ...
Page 2: ......
Page 10: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 19: ... 9 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 20: ... 10 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ... 24 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 79: ... 69 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 80: ... 70 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ... 104 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 173: ... 163 SV1406 FIG A PINCHING OFF TUBING FIG B RE ROUNDING TUBING USING PINCH OFF TOOL ...
Page 177: ......
Page 178: ......